電氣工程英文簡歷表格

學識都 人氣:1.41W

作爲求職者想要憑藉個人簡歷求職成功就必須要知道自己有什麼樣的求職優勢,瞭解自己的求職優勢才能夠掌握編寫個人簡歷中的側重點。金無足赤人無完人,在個人簡歷的編寫中要學會揚長避短。如果你沒有高等學歷就需要着重編寫專業技能,如果你沒有工作經驗就需要着重編寫學業成就,如果你沒有專業技能就需要着重編寫英語水平。在個人簡歷中要挑選自己擅長的技能編寫,這樣才能夠更大程度上取得用人單位的.青睞,從而獲得面試機會。

電氣工程英文簡歷表格

有針對性的個人簡歷更容易獲得面試機會,想要通過個人簡歷獲得招聘人員的認可在編寫個人簡歷之前就要知道自己想要在用人單位中獲得一個什麼樣的職位。當明確自己的職位過後就可以按照職位所需要的人才來編寫自己的個人簡歷,並且在編寫工作經驗時也需要選擇與職位相關的來編寫。

Name:本站Sex:
Date of Birth: Hukou:
Residency:Work Experience:
Current Salary:Tel:
E-mail:
Career Objective
Desired Industry:Electronics/Semiconductor/IC ,Science/Research ,Government ,Others ,Testing, Certification
Desired Position:Senior Hardware Engineer ,Semiconductor Technology, Branch Office Manager ,Chief Representative ,Research Specialist Staff
Desired address:Shanghai ,Hongkong ,Beijing ,Taiwan ,MacaoDesired Salary:Negotiable
Work Experience
2006/06—Present***Company
 Industry: Electronics/Semiconductor/IC
Intel Flash Engineering Department Individual Contributor
Responsibilities:
I have been working in Intel Flash Assembly & Test Engineering
Department as an Individual Contributor since June of 2006.
Being Leader of ATE Yield team, I have been working with the team members to improve the products yield. Our efforts are paid off:
1. The yield of year 2006 has been dramatically increased than that of year 2005.
2. The yield of all products, consecutively meets the goal.
3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
Report Directly to: Department ManagerNumber of Subordinate: 14
Reference: Bao Powel
Achievements: Being Leader of ATE Yield team, I have been working with the team members to improve the products yield.
Our efforts are paid off:
1. The yield of year 2006 has been dramatically increased than that of year 2005.
2. The yield of all products, consecutively meets the goal.
3. The total amount of cost saving due to yield improvement is more than $1 million compared with year 2005. Being the Leader of Board Repair Team in ATE, I worked with my team members, setup a set of new procedure to replace the current one, I defined the schedule, divided the roles & responsibilities among team members, follow up the progress. Finally, the team has made a great cost saving of $2.5M in 2007.
2006/01—2006/05Intel(Shanghai) Technology Development Ltd. Company
 Industry: Electronics/Semiconductor/IC
Intel STTD-China Department Electronics Development Engineer
Responsibilities:
1. I had been working in STTD-China since Jan 2006 to May 2006 as a senior module engineer.
2. At that time, as a main contributor of this project, we succeeded in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one time.
Report Directly to: Hopman Mark   Number of Subordinate: 14
Reference: Bao Powel
Reason for Leaving: I was transferred to Intel(Shanghai)Products Ltd. Company due to the internal re-organization in June of 2006.
Achievements: As a main contributor of STTD-China department, I co-work with my colleagues to succeed in developing a set of MASSIVELY PARALLEL CLASS TEST equipment, which is able to test more than 6700 units in one cycle.
2005/05—2006/01Nanyang University of Science & Technology
 Industry: Electronics/Semiconductor/IC
Electronics & Electrical Engineering Department Research Fellow
Responsibilities:
1. I work in Electronics & Electrical Engineering Department of Nanyang University of Science & Technology as a Research Fellow.
2. I majored at Gate Oxide Reliability Research in the duration.
Report Directly to: Professor Pey Kin Leoh 
Subordinate: 3
Reference: Patrick Low
Reason for Leaving: I completed the project which I undertook by myself, and want to do more challenging job.
Achievements: In less than one year, I made a lot of experiments and acquired the wonderful data for the project by myself.
 Project Experience
2008/01—PresentAssembly NPI (New Product Introduction)
 Project Description: To introduce more products into Intel Flash Assembly factory, I join Assembly NPI team and work as the team leader. I coordinate with IE, Planner, Marketing guy and Engineer to select new product items, do demo in factory, and then qualify it.
Responsibility: I am working as NPI Team leader and coordinate all team members, define the NPI candidate, make Assembly build plan, follow up the progress.
2007/01—2007/12Marginal Electrical Boards Rescue
 Project Description: To rescue some electrical boards of testing equipment, a Task Force team was built up and led by me. We categorized each kind of board, made historical failure analysis on each kind of board and around &2.5 million dollars was saved finally.
Responsibility: Being the team leader, I took the job of data analysis, define each member's role, make program plan, coordinate each team member and follow up the progress.
2006/10—2007/05Optimization the current Test Process Order for Flash Memory
 Project Description: To simplify the current Test procedure and enhance the working efficiency, a Task Force team has been called and started by me.
Responsibility: Being the Project leader, I take the main responsibility, such as, design, plan, organize and implement.
2006/05—2006/12Test Yield of Flash memory Improvement
 Project Description: To improve the test yield of different products, a Task Force team was built up and led by me. Being the team leader, I worked with all team members to dig out the failure root cause for each product, defined action taken plan for each emergency case, coordinated each team member and make pro-active plan to avoided unexpected things happen.
Responsibility: Being the team leader of Improving Test Yield, coordinate each team member, make program plan and follow up.
 Education and Training
2005/05—2006/01Nanyang University of Science & Technology Microelectronics Doctorate
 I worked in Nan yang University of Science & Technology as a Research Fellow. I major at Gate oxide Reliability research in the duration.
2004/03—2005/03Seoul National University of Korea Microelectronics Others
 I had been working in National Physical Lab of Seoul National University in Korea since March of 2004 to March of 2005 as a Post-doctor. Where I unhook the project of research & development of Carbon-Nan tube Biosensor. And only after one year, an EIS sensor based on CMOS technology has been successfully produced. And one SCI paper about it has been published in Semiconductor Science and Technology.
2001/03—2004/03Shanghai Institute of Microsystems and Information Technology,Chinese Academy of Sciences Information Technology Doctorate
1998/09—2001/03Nanjing University of Science & Technology Material Science and Engineering Master
 Being a master student of this period, I have published one EI paper about Super-fine metal power's electrical characteristics.
1993/09—1997/07Nanjing University of Science & Technology Material Science and Engineering Bachelor
1997/07—1998/07Assistant Engineer in Quality Verification Department, Boiler Factory in Zhengzhou city of Henan resistant Engineer in Quality Verification Department
 Professional Skills
Language Skills:English: EXCELLENT
Korean: AVERAGE
Computer Skills:Technology   skilled 96Month
SAP   understanding 8Month
Certificate:2000/11  MCSE
1999/06  CET6
 Self-appraisal
7 years working experience of Semiconductor Industry and where 2 years overseas working/study experience. Smart working, innovation thinking and very talented creative working model.