機械設計製造及其自動化英文簡歷

學識都 人氣:2.74W

簡歷注水這種做法並不是個別兩個的,也不是一兩成的人這麼做,而是七八成以上的'人都是這麼做的,難道說作爲應聘者我們能不這麼做嗎?到時候我們的簡歷在起點上就比人家低了一個檔次以上,這樣還能夠贏得對方的好感嗎?但是注水肯定也應該建立在一種適當的範圍之內,我們可以利用補充職位的範圍來進行注水,不過這個度到底應該控制哪個比例之內才合適?

機械設計製造及其自動化英文簡歷

起碼應該保證簡歷當中的虛浮內容控制在三成之內,不能超過這個限度,否則的話就會對其產生不利的影響。我們可以以一種美化自己的目的進行注水,這樣你在注水的時候也不會顯得空洞,要是你講的東西完全都是假的,恐怕你自己在寫的時候都不知道如何表達出來。

下面是本站小編和大家分享的機械設計製造及其自動化英文簡歷,更多內容請繼續關注個人簡歷網。

篇一:簡歷模板

本站

Nationality:China (Mainland)

Current Place:Guangzhou

Height/Weight:165 cm?55 kg

Marital Status:married

Age:29 years

Career Objective

Application type:Jobseeker

Preferred job title:Quality Management/Testing Manager((QA/QC Manager): QC/QA Manager or SQM 、 Production Manager/Workshop Director: 、 Factory manager/Factory Director:

Working life:5Title:Middle title

Job type:Full timeExpected Start date:In a week

Expected salary:¥5,000--¥8,000Preferred working place:Guangzhou Foshan Zhongshan

Work experience

Company's name:Harvest Industry LTDBegin and end date: 2008-07-2008-11

Enterprise nature:Sino-foreign joint venturesIndustry: Communication/Telecom/Network Equipment

Job Title:

Job description: I had to be resbonsibed some project. One of the is the manufacturing efficiency improvement project,improved the run rate from 5.5 to 7.5,and now had promoted in hole factory.

Responsibled the ERP project in a team, and got the MRP solution by JIT.

In this time participated for the NPI(New Product Introduction) project by STRIX(U.K) LTD .

Reasons for leaving: Salary & working condition

Company's name:Hangzhou Meisda Electric Appliance Co., n and end date: 2003-10-2008-06

Enterprise nature:Private enterprisesIndustry: Communication/Telecom/Network Equipment

Job Title: Designer-QC Vice Manager-Manufacturing Manager

Job description: 2003-10--2004-07:Technology,Design,Responsible for the design of the structure;

2004-07--2005-04:Technology,Product technology,include the new production technology and improve the technology of on-site problems

2005-04-2007-10:QC QC manager from 2006-04.

In the early 2005 building products performance test systems, the standard refrigeration testing laboratories and automatic test line.

At the end of 2005 to early 2006 to establish the ISO 9001 QMS and passed certification by WIT Assessment.

Extension of the quality management of suppliers,Evaluation of supplier monthly,and equire suppliers to rectify,and help the supplier to improve the quality of the parts who supplied. The total passing rate of the parts from 83%(2006) to 92%(2007)。

2007-10--2008-06:manufactory,as a manufacturing management of production technology, production, procurement and supplier.

Optimization of IE,improve the effeciency,reduced costs ¥3/PC,20%.

Reasons for leaving: For some reason of family

Educational Background

Name of School:Zhejiang University

Highest Degree:MasterDate of Graduation:2003-06-01

Name of Major 1:Machine DesignName of Major 2:Business Administration

Education experience:Start dateEnd dateEducation organizationMajorsCertificateCertificate No

1999-092003-06Xiangtan UniversityMachine DesignBachelor10530420030004087

2005-052007-04Zhejiang UniversityBusiness AdministrationLeaving Certificate20050150

2005-092005-09WIT ASSESSMENTISO9001:2000

Language Ability

Foreign Language:EnglishLevel:good

Language ability:I am able to communicate in English, and also can read some English technical documents.

Chinese level:excellentCantonese Level:poor

Relevant skills and abilities

I had worked in factory more than 5 years be resbonsibed QC and manufacturing manager.

Self-recommendation letter

I am a sweet-tempered man, and have good ability to learning. In the past five years, I worked in a electric appliance manufactory, as design engineer, QC engineer,QC/QA manager and mauafatory manager.I can manage the manufactory across the aborad. In that factory at the past time, with responsibility for QMS ISO 9001:2000, and passed the QMS assessment by WIT ASSESSMENT.

 

篇二:簡歷模板

Name: 本站

Gender: Female

Date of birth: 1972-02-16

Mouth: Jiangsu

The current city: Shanghai City

Work experience: five years

The current annual salary: 5-6 million yuan

Mobile phone:

Residential address:

Self evaluation

5 years working experience in mechanical design, by CET-6. Pro-E, familiar with AutoCAD, Solidworks and Office, familiar with the process, can be engaged in the design and development and project management.

Job intention

Target industry: Machinery / equipment / instrument / heavy industry, industrial automation, automobile and spare parts, petroleum / chemical / mineral / Geology

Target position: Mechanical Engineer

Expectations: Shanghai City

Expected salary: salary welfare needs to fill, generally relatively safe negotiable

Time: how long can the arrival of new jobs

Work experience

2007/07 XXX now

Industry: Machinery / equipment / heavy industry

Department of Mechanical Design Engineer

Main responsibilities

1 by the individuals responsible for project, master project schedule, assist business personnel to understand customer needs, design fixture, fixture, equipment modification and field surveying and mapping parts, including assembly drawing, part drawing, BOM list, assist purchasing staff.

2 by the individuals responsible for project, master project schedule.

3 customers are Shanghai GM, Shanghai Volkswagen, Shanghai Natiefu, Wuxi BOSCH, Wuhu United States, Kunshan and Hangzhou etc. universal Fuji.

2003/06 2007/06: Shanghai Keepahead ultrasonic equipment Co., Ltd.

Industry: Machinery / equipment / heavy industry

Department of Mechanical Design Engineer

Main responsibilities:

1 responsible for the project, including equipment assembly and parts production drawings, outsourcing list, pipeline map, assist the purchasing staff to support business personnel, at the same time tracking solution occurs processing manufacturing and assembly debugging problems, and through customer acceptance, and write instructions, sometimes also translated the equipment specifications (export in the English translation).

2 the design of automatic ultrasonic cleaning equipment automatic mechanical arm, through the tunnel drying equipment, automatic high pressure spray, ultrasonic cleaning, wind drying (with the netbelt) and other non-standard equipment.

1998/10 2002/12: Suzhou hongly mould machinery Co. ltd.;

Industry: Machinery / equipment / heavy industry

Technical department technician

Main responsibilities:

The preparation process, and according to the 2D drawings of Singapore engineer design, using Cimtron three-dimensional modeling, and translation of faxes and E-mail. Our products are stainless steel mould of glass.

Project experience

2008/06 2008/07: body machining fixture

Development tools: Pro-e, AutoCAD

Project Description: the fixture fixture for machining workpiece machining center, to the workpiece through the lateral expansion clamping device and the fixing plate, cutting through the spring pin to locate the center hole, take through the length of axis elliptical groove turntable mechanism to realize workpiece.

Responsibility description: responsible for the design of parts and assembly plans, production schedule, follow up the progress, solve the problems in the process of production and assembly.

2007/12 2008/01: a hole position check out

Development tools: Pro-e, AutoCAD

Project Description: the detector used for detecting the position degree of casting hole, products will be placed on the bottom position through a pin to detect the position of the workpiece, the detection position of the other inclined hole made reference plate and pin assembly of the handheld, seized by CMM, if not in the tolerance range of customer requirements in (+ 0.03), need to adjust.

Responsibility description: Design of parts and assembly plans, production schedule, track progress, solve problems, adjust the fixture to meet customer requirements in the tolerance range.

2006/04 - 2006/06: automatic high-pressure spray, ultrasonic cleaning, wind drying equipment production line

Development tools: AutoCAD

Project Description: this production line is used for cleaning and drying of stamping aluminum, steel mesh belt through the motor drive transmission of the workpiece, the first workpiece feeding section, the first and the two or three position is medium pressure spray, fourth, five or six position is the high-pressure spray, through high pressure pump and high pressure spray system, air knife with seventh air compressor station the water cut is eighth station, tunnel oven, final workpiece material.

Responsibilities: assist business personnel to understand customer needs, design and manufacture of the assembly and parts diagram, communication and electrical engineers, support the procurement staff, tracking the progress of solving the production problem, initial customer acceptance records of customer comments, until final acceptance by the customer.

Education and training

1994/09 1998/06: of Wuhan University of science and technology of metallurgical mechanical design and manufacturing automation degree

Certificate

1998/06 master's degree certificate

1996/09 passed the university English six levels

Language ability: English: good